SECOND STEEL PIPE FACTORY

Administrator | 29 May 2013

President Director of PT Krakatau Steel Tbk Irvan Kamal Hakim (right) Valium 2 mg online http://www.gastonpharmacy.com/valium.php accompanied by President Commissioner Zacky Anwar (left) and President Director of PT KHI Pipe Industries Purwono Widodo when inaugurating the construction of KHI’s second steel pipe factory in Cilegon, Banten, Tuesday (21/5). The steel pipe factory, which was built with a total investment of Rp. 335.6 billion with a capacity of 150,000 tons per year, uses steel raw materials from KS and began operating in October 2014. Generic Ambien online http://www.wolfesimonmedicalassociates.com/ambien/






Back to News