In September 2010, PT KHI plans to start working on a coating pipe and a 30,000 meter long ERW concrete pipe to supply gas to PLTG Sengkang, South Sulawesi. ERW Pipe Dia. 8 inches Sch. 40 with API specifications 5 L Gr. B 28,000 meters will be coated with 3-LPE and the rest will be coated with weight coating concrete. For this project, PT KHI conducted a consortium with PT SPINDO Surabaya where PT KHI became the leader.